ROADS AND INFRASTRUCTURE IN ALWAJBA EAST-PACKAGE 01 AND 03(DW016-P01 & P03)

INFRASTRUCTURE project at ALWAJBA-EAST (SURFACE WATER, FOUL SEWER, TSE NETWORKS & ROAD WORKS) with GALFAR ALMISNAD CO. as a MAIN CONTRACTOR. Start date: September 14th, 2021 Hand-over date: April 15th, 2022

ROADS AND INFRASTRUCTURE IN ALWAJBA EAST-PACKAGE 01 AND 03(DW016-P01 & P03)